Permit Required? Required if over 30 in above grade
Typical Fee Range $680–$1,200 Platforms not over 30 in above grade need no building permit; guards required above 30 in
Fee Method Valuation-based permit fee + 90% plan check fee
Apply Online Apply at LADBS →

What's Required in Los Angeles

  • Platforms not more than 30 in above grade, and work valued at $2,500 or less, are exempt from a building permit (LAMC 91.106.2)
  • Decks higher than 30 in need an LADBS building permit with a valuation-based fee and a plan check fee equal to 90% of the permit fee
  • Raised walking surfaces over 30 in require 42-in guards, which count toward fence height in yards
  • Open unroofed platforms may project up to 6 ft into a required yard and no more than 6 ft above natural grade (not in hillside front yards)
  • Plans: plot plan with property-line distances, framing and footing plan, Type V sheet or engineer's calculations
  • Structural repairs to existing decks need a building permit; express framing-repair permits exclude decks
  • Owner-builders sign the Owner-Builder Declaration; contractors need a CSLB B license
  • Inspections at footings, rough framing and final, requested a day ahead before 2 PM
  • Permit expires if work has not started within six months

Do You Need a Permit to Build a Deck in Los Angeles?

It depends on height and value. The 2026 Los Angeles Building Code, LAMC 91.106.2, exempts platforms, walks and driveways not more than 30 inches above grade and not over any basement or story below, and separately exempts work valued at $2,500 or less that does not affect structural stability or public safety. A low ground-hugging deck therefore needs no building permit from the Department of Building and Safety (LADBS). Once the walking surface is higher than 30 inches you need a permit, a guard at least 42 inches high, and plans that show footings, framing and the ledger or posts. An attached deck is filed as an addition; a detached one as a new accessory structure. The zoning code also limits how far a deck may project into a required yard and how high it may sit, and a roof over it turns it into a patio cover with its own standard.

Los Angeles Deck Permit Rules by Scenario

What you are doingCity filingRule
Platform or deck not more than 30 in above gradeNoneLAMC 91.106.2 item 5; zoning yard rules still apply
Any deck work valued at $2,500 or lessNone unless it affects structural stabilityLAMC 91.106.2 item 1
Deck higher than 30 in, attached to the houseBuilding permit with plan check (addition)Valuation-based fee; 42-in guards required
Detached raised deckBuilding permit with plan check (new structure)Counted as a separate structure only if 10 ft from the house
Replacing rotted joists, posts or stairs on an existing deckBuilding permit; express permit excludes decksExpress Permits IB item 14 and 15
Recoating an existing deck surfaceExpress permit, no plan checkExpress Permits IB item 24
Adding a roof or coverBuilding permit as a patio coverIB P/BC 2026-006 Attached Patio Cover

How Much Does a Deck Permit Cost in Los Angeles?

LADBS charges a building permit fee on the valuation of the work and a plan check fee equal to 90 percent of the permit fee, plus surcharges on both. The city's Permit Fee Calculator, run as a residential addition, returns a permit total of $363.15 and plan check of $317.13 for a $15,000 deck, about $680 together; $501.90 plus $442.01, about $944, for $25,000; and $637.90 plus $563.50, about $1,201, for $40,000. Those totals already include the green building, plan maintenance, earthquake instrumentation, planning and system surcharges. Paying by card adds 2.7 percent. A permit for a $10,000 alteration such as reframing part of an existing deck runs $250.40 plus $214.19 plan check.

Zoning: Where a Deck Can Sit

LADBS bulletin P/ZC 2023-004 explains the yard rules. An open, unroofed porch, platform or landing that does not extend above the first floor may project up to 6 feet into a required front, side or rear yard, but may never be more than 6 feet above natural grade there, and the rule does not apply to front yards on hillside lots. Any surface higher than 30 inches needs a 42-inch guard, and the guard counts toward the overall wall or fence height. A detached deck is treated as a separate structure only if it is at least 10 feet from the house.

Who Pulls the Permit and What Gets Inspected

Homeowners may sign for an owner-builder building permit after reading and initialing the Owner-Builder Declaration at issuance. A hired contractor needs a CSLB license, and LADBS matches building permits to the B classification. Bring a plot plan with distances to property lines, a framing plan and footing details; the Type V sheet from any LADBS counter covers most prescriptive wood framing. Simple decks go through Counter Plan Check, which LADBS finishes over the counter the same day in about 45 minutes. Inspections are requested a day ahead, before 2 PM: footings before concrete, rough framing before decking, and final. The permit lapses if work does not start within six months.

How to Get a Deck Permit in Los Angeles

1

Measure height and value

At or below 30 in above grade, or a job worth $2,500 or less with no structural change: no building permit. Otherwise file.

2

Check the yard rules

Confirm setbacks in ZIMAS; unroofed platforms may project 6 ft into a required yard and sit no more than 6 ft above grade there.

3

Draw the plans

Plot plan, framing plan, footing and ledger or post details; use the LADBS Type V sheet for prescriptive framing or an engineer's stamped plans.

4

Plan check and permit

Counter Plan Check is same-day, about 45 minutes; fees run about $680 total for a $15,000 deck and about $1,201 for $40,000. Owner-builders sign the declaration at issuance.

5

Build and inspect

Request inspections a day ahead: footings before concrete, framing before decking, then final. Guards must be 42 in where the deck is over 30 in high.

Frequently Asked Questions

No. LAMC 91.106.2 exempts platforms, walks and driveways not more than 30 inches above grade and not over a basement or story below, and separately exempts work valued at $2,500 or less. Anything higher than 30 inches needs an LADBS building permit and a 42-inch guard. Zoning yard rules apply either way.
Fees are valuation-based. The LADBS calculator returns about $680 in permit plus plan check for a $15,000 deck, about $944 for $25,000 and about $1,201 for $40,000, surcharges included. A $10,000 repair or reframing runs $250.40 for the permit plus $214.19 plan check. Card payments add 2.7 percent.
If the job is valued at $2,500 or less and does not affect structural stability, it is exempt. Replacing joists, beams, posts or stairs is structural and needs a building permit; LADBS's express-permit list specifically excludes decks from its framing-repair items. Recoating an existing deck surface is an express permit.
An open, unroofed platform not above the first floor may project up to 6 feet into a required yard but may not be more than 6 feet above natural grade there, per LADBS bulletin P/ZC 2023-004 citing LAMC 12.22 C.20(e). The rule does not apply to front yards of hillside lots.
Yes. LADBS issues owner-builder permits to homeowners who read and initial the state Owner-Builder Declaration. If you hire someone, they need a CSLB license for any permitted work; LADBS matches building permits to a B license. An unlicensed handyman is limited to jobs under $1,000 that need no permit.
A simple wood-frame deck usually qualifies for Counter Plan Check, which LADBS completes the same day in about 45 minutes or less, or Expanded Counter Plan Check, about 2 hours. Plans can also be uploaded to ePlanLA. LADBS does not publish a fixed turnaround for larger hillside or engineered decks.