Permit Required? Depends (systems or walls)
Typical Fee Range $0–$2,200 Cabinets and finishes exempt; plumbing permit is King County's; electrical from $105.12
Fee Method Table D-1 index on job value + 40% plan review (STFI)

What's Required in Seattle

  • No building permit for cabinets, countertops, flooring and surface finishes in the same layout, or for minor alterations worth $6,000 or less in six months with no load-bearing changes.
  • Layout changes over $6,000, wall openings and structural work need an SDCI construction permit; non-structural work and bearing-wall openings with beams up to 14 ft qualify for STFI.
  • Plumbing and gas piping permits come from Public Health Seattle and King County ($137 plus $27 per fixture or outlet in 2026); homeowners may permit their own plumbing.
  • New or altered circuits need an SDCI electrical permit pulled by a licensed electrical contractor or the owner-occupant doing the work; the online minimum is $105.12 plus a $55.48 administrative fee.
  • STFI fees are value-based: Table D-1 index plus 40 percent plan review, 5 percent technology fee and the $6.50 state surcharge.
  • Submit scaled existing and proposed floor plans with the Building and Land Use Pre-Application; a professional stamp is rarely required.
  • Unremodeled parts of the house need not be upgraded to current code, but structural impacts of the remodel must be accounted for.
  • The construction permit is valid for 18 months; reinspections cost half the $292 base fee.

Do You Need a Permit to Remodel a Kitchen in Seattle?

It depends on what you touch. Seattle Residential Code R105.2 exempts installing kitchen cabinets, paneling or other surface finishes over existing walls and ceilings, painting, and any minor repair or alteration worth $6,000 or less in a six-month period that does not remove, reduce or relocate load-bearing support. So a same-layout kitchen with new cabinets, counters, flooring and backsplash needs no SDCI building permit. Three things pull the job into permit territory: plumbing (moving the sink, adding a dishwasher line, running gas) needs a permit from Public Health Seattle & King County, which issues every plumbing and gas permit in the city; new or altered circuits need an SDCI electrical permit; and a layout change over $6,000 or any wall work needs an SDCI construction permit, for a non-structural kitchen a subject-to-field-inspection (STFI) permit priced on value.

Seattle Kitchen Permit Rules by Scenario

What you are doingCity filingRule
New cabinets, countertops, flooring, backsplash, paint; same layout, same hookupsNoneSRC R105.2 item 2
Minor alterations worth $6,000 or less in six months, no load-bearing changesNone (building); trade permits still applySRC R105.2 item 1; R105.3
Moving the sink, adding a dishwasher or disposal drain, new water or gas linePublic Health plumbing or gas permit: $137 plus $27 per fixture or outletPHSKC fee schedule (2026)
New circuits, relocated outlets, more than 5 like-for-like devicesSDCI electrical permit (online; $26.28 per circuit up to 25 A, $105.12 minimum plus $55.48 admin)Seattle Electrical Code 80.50; Table D-15
Non-structural layout change over $6,000 (moving partitions, new window openings in non-bearing walls)STFI construction permit, value-basedTip 316; Fee Subtitle Table D-2
Opening a bearing wall supporting one story and roof, beam span up to 14 ftSTFI construction permit with structural detailTip 316
Replacing a range, dishwasher or fridge on the existing circuit and hookupsNo electrical permit; plumbing permit only if the piping changesSeattle Electrical Code 80.50(B)(4); PHSKC

How Much Does a Kitchen Remodel Permit Cost in Seattle?

Three permits, three fee systems. SDCI construction permit: Table D-1 of the 2026 Fee Subtitle converts job value (labor and materials) into a Development Fee Index; an STFI permit pays 100 percent of the index as the permit fee and 40 percent as plan review, plus a 5 percent technology fee and the $6.50 state surcharge. A $30,000 kitchen: $709 for the first $25,000 plus 50 x $1.55 = $77.50, index $786.50; permit $786.50 + plan review $314.60 = $1,101.10; with $55.05 technology fee and $6.50, $1,162.65. A $60,000 kitchen: index $1,246.50, total $1,838.85. Plumbing: Public Health charges $137 plus $27 per fixture, so a sink and dishwasher are $191. Electrical: SDCI's online table charges $26.28 per new or altered branch circuit up to 25 amps and $43.80 for 30 to 50 amps, with a $105.12 minimum and a $55.48 administrative fee; four small-appliance and lighting circuits come to $105.12 + $55.48 = $160.60, or $168.63 with the technology fee. A permitted $30,000 kitchen therefore carries about $1,520 in permits, and a $60,000 kitchen about $2,200. SDCI raised construction permit fees 18 percent in 2026.

Who Can Pull the Permits?

The building permit is applied for by the owner or the owner's agent through the Seattle Services Portal, and house drawings rarely need an architect's or engineer's stamp. Electrical permits go to a contractor holding a Washington electrical contractor license and a Seattle business license, or to the owner-occupant doing the work personally; if you take a homeowner permit and then hire someone, SDCI can add the contractor. Plumbing permits are issued by Public Health to a registered plumbing contractor or, for owner-performed work, as a homeowner permit under RCW 18.106.150.

How the STFI Process Works

Start a Building & Land Use Pre-Application in the Seattle Services Portal with a site plan and the legal description, then upload existing and proposed floor plans to scale; Tip 316 confirms that non-structural interior alterations in single-family and duplex homes typically qualify for STFI, as do bearing-wall openings within the 14 ft beam limit. SDCI screens the application in a few days, you pay the fee, and the permit and stamped plans appear in the portal. The inspector then checks framing, insulation and the energy and ventilation rules on site rather than through plan review. Converting attic storage into living space, or work that disturbs more than 750 sq ft of ground, cannot be STFI. Existing parts of the house you are not remodeling do not have to be brought up to current code. The permit is valid for 18 months, and a reinspection costs half the base fee.

How to Get a Kitchen Remodel Permit in Seattle

1

Sort the scope into three buckets

Finishes and same-place fixtures need nothing; moved plumbing goes to Public Health; new circuits go to an SDCI electrical permit; layout or wall changes over $6,000 go to an SDCI construction permit.

2

Draw existing and proposed plans

Prepare scaled floor plans showing walls, fixtures, appliances, ventilation and any beam over a bearing wall; keep the beam span to 14 ft or less to stay in the STFI track.

3

Apply in the Seattle Services Portal

Create a Building and Land Use Pre-Application with a site plan and legal description, upload the plans, answer yes to the subject-to-field-inspection question, and pay the value-based fee when SDCI issues the permit after a few days of screening.

4

Pull the trade permits

The electrician (or you as owner-occupant) buys the online SDCI electrical permit; the plumber (or you) gets the Public Health plumbing or gas piping permit before opening walls.

5

Inspect before cover and at final

Schedule the SDCI framing and electrical cover inspections and the Public Health rough plumbing inspection before drywall, then the finals; plan several business days for a plumbing inspection slot.

Frequently Asked Questions

No. SRC R105.2 item 2 lists installing kitchen cabinets, paneling or other surface finishes over existing walls and ceilings as exempt work, provided nothing changes in the building envelope. Keep the sink, dishwasher and outlets where they are and no plumbing or electrical permit is triggered either.
A non-structural kitchen remodel is an STFI construction permit priced on value: about $1,160 for a $30,000 job and $1,840 for $60,000, including the 5 percent technology fee and the $6.50 state surcharge. Add $137 plus $27 per fixture for the Public Health plumbing permit and about $169 for a four-circuit SDCI electrical permit, so roughly $1,520 to $2,200 all in.
Public Health Seattle and King County, not SDCI. It enforces the Seattle Plumbing Code and requires a permit whenever a plumbing or gas piping system is installed, relocated or changed. The 2026 fee is $137 plus $27 per fixture; gas piping is $137 plus $27 per outlet. Homeowners may take out a permit for plumbing they do themselves; hired plumbers must be registered contractors.
Yes if you own and occupy the home and do the work yourself; SDCI issues homeowner electrical permits online, often the same day. Otherwise the electrical contractor must hold a Washington electrical contractor license and a Seattle business license and pull the permit. Replacing up to five outlets or switches like-for-like, or reconnecting an appliance to its existing lawful circuit, needs no permit.
Yes. Even a non-structural partition change over the $6,000 minor-work limit needs a construction permit, and any load-bearing change always does. Tip 316 lets SDCI handle it as a subject-to-field-inspection permit when the wall supports only one story plus roof and the new beam spans 14 ft or less (30 ft with a manufactured truss); longer spans mean full plan review.
STFI applications are screened in a few days once the pre-application, plans and fees are in, and the permit and stamped plans are issued electronically. Same-day online electrical permits and Public Health plumbing permits run in parallel. A remodel that needs full plan review follows the addition or alteration timeline, where SDCI aims for a 2-3 week initial review on simple projects.