Permit Required? Required (zoning permit, all sizes)
Typical Fee Range $35–$105 Front and street-side yards are capped at 3 ft; other yards 8 ft in residential zones.
Fee Method Zoning wall permit $35; over 6 ft valuation-based

What's Required in Albuquerque

  • Every wall or fence needs a permit: Zoning Counter approval ($35) up to 6 feet, a building permit above 6 feet.
  • Residential zoning caps: 3 feet in the front or street side yard, 8 feet elsewhere on the lot (IDO Table 5-7-1).
  • Corner lots: rear-yard wall abutting a neighbor's front yard is limited to 3 feet within 10 feet of the street lot line, 6 feet beyond.
  • Walls over 6 feet, or existing walls raised above 6 feet, must be certified by a New Mexico registered structural engineer or architect.
  • Wall height is measured from the low side of grade; a garden wall on a retaining wall counts the combined height.
  • Plans for a permitted wall: site plan with wall lengths, property line dimensions, setbacks, easements and grading, at 1/4 inch scale with sections at 1/2 inch.
  • Building permits for walls are issued only to the owner-occupant or a New Mexico GB-2 or GB-98 general contractor.
  • Inspections for a permitted wall: foundation or footing, bond beam or reinforcement, and final.

Do you need a permit to build a fence in Albuquerque?

Yes, at any height, but which permit depends on the height. The Building Safety permits page puts it plainly: walls and fences over six feet high need a building permit, and walls and fences under six feet require a permit from the Zoning Counter. The 2024 Uniform Administrative Code (109.2.1) is the source of the six-foot line: exterior fences and freestanding masonry walls not over six feet high above grade on the lowest side are exempt from the building permit. The zoning permit is the Wall or Fence Approval (Minor) on the General Planning Fee Schedule, $35 in total, applied for online through the Code Enforcement side of ABQ-PLAN. Build a wall without it and the same schedule charges $90.

How tall can a fence be in Albuquerque?

The Integrated Development Ordinance sets the zoning caps in Table 5-7-1. In residential zones a wall in the front yard or street side yard is limited to 3 ft, and a wall in other locations on the lot is limited to 8 ft. On a corner lot, the part of a rear-yard wall that abuts a neighbor's front yard is held to 3 ft within 10 ft of the street lot line and 6 ft beyond it. A taller front-yard wall is possible with a Permit – Wall or Fence – Major: view fencing that is at most 50 percent opaque may be added above 3 ft, to 5 ft within 10 ft of the street lot line and 6 ft beyond, per Table 5-7-2. Anything over Table 5-7-1 needs a Variance. Height is measured from the low side of grade, and a garden wall built on a retaining wall counts the combined height.

How much does a fence permit cost in Albuquerque?

Up to 6 ft: the $35 zoning fee. Over 6 ft you pay the zoning fee plus a building permit priced from UAC Table 112-A by valuation, times the 0.50 modifier for one- and two-family homes, plus 65 percent plan review. Table 112-F supplies the per-foot valuation guide: a cedar wood fence is $31.00 per lineal foot at 8 ft, a CMU garden wall $55.40. Worked examples for 100 lineal feet:

  • 8 ft cedar fence: 100 x $31.00 = $3,100. Table 112-A: $69.25 + 2 x $14.00 = $97.25; x 0.50 = $48.63 permit + $31.61 plan review = $80.24.
  • 8 ft CMU wall: 100 x $55.40 = $5,540. Table 112-A: $69.25 + 4 x $14.00 = $125.25; x 0.50 = $62.63 + $40.71 = $103.34.

Walls over 6 ft, and existing walls raised above 6 ft, must be certified by a New Mexico registered structural engineer or architect, which is usually the larger cost. Retaining walls are a separate case: the UAC exempts retaining walls with up to 36 inches of grade difference from a building permit, while the 2017 wall handout asks for engineer certification above 24 inches and says garden walls cannot retain more than 24 inches. Ask the plan reviewer which applies before you design one.

What you are doingCity filingRule
6 ft cedar fence along the back and sidesZoning wall permit, $35Under 6 ft is exempt from the building permit (UAC 109.2.1) but needs Zoning Counter approval.
3 ft front-yard wallZoning wall permit, $35IDO Table 5-7-1 caps front and street side yard walls at 3 ft in residential zones.
5 ft front-yard wall with open view fencingPermit – Wall or Fence – MajorTable 5-7-2: view fencing at most 50 percent opaque may rise to 5 ft within 10 ft of the street lot line, 6 ft beyond.
8 ft CMU wall in the rear yardBuilding permit + plan review, about $103Over 6 ft: engineer or architect certification, Table 112-A fee, foundation and bond-beam inspections.
Raising an existing 6 ft wall to 7 ftBuilding permit + plan reviewExisting walls raised above 6 ft must be certified by a NM engineer or architect.
9 ft wall in a residential zoneVariance requiredIDO Table 5-7-1 stops at 8 ft in other locations on a residential lot.
Wall built without a permitZoning fee $90 plus building investigation feeGeneral fee schedule: $90; UAC 112.4 adds an investigation fee equal to the permit fee.

Who can pull the permit?

Over 6 ft, the building permit is issued only to the homeowner or a New Mexico GB-2 or GB-98 general contractor, and the application expires if the permit is not issued within six months. Inspections for a permitted wall are foundation or footing, bond beam or reinforcement, and final. If your subdivision has an HOA, the city expects its approval first and does not enforce HOA rules.

How to Get a Fence Permit in Albuquerque

1

Check the height limit for the yard

Use IDO Table 5-7-1: 3 feet in the front or street side yard, 8 feet in other locations, with the corner-lot rule for walls facing a neighbor's front yard.

2

Apply for the zoning wall permit

File the Wall or Fence Approval (Minor) online through the Code Enforcement permitting system and pay $35; this covers any fence up to 6 feet.

3

Over 6 feet: get the plans certified

Have a New Mexico registered structural engineer or architect certify the wall design, and prepare a site plan with lengths, property lines, setbacks and grading.

4

Submit the building permit in ABQ-PLAN

Upload the plans as the owner-occupant or through a GB-2/GB-98 contractor and pay plan review (65 percent of the Table 112-A fee times 0.50).

5

Build and pass inspections

Post the permit and approved plans on site and call for the foundation or footing, bond beam or reinforcement, and final inspections.

Frequently Asked Questions

You need the zoning wall permit, not a building permit. The UAC exempts exterior fences and freestanding masonry walls not over six feet above grade on the lowest side from the building permit, but the permits page says walls and fences under six feet require a permit from the Zoning Counter, which costs $35 on the General Planning Fee Schedule.
Three feet in a residential zone, per IDO Table 5-7-1, for any wall in the front yard or street side yard. With a Wall or Fence Major permit you can add view fencing that is at most 50 percent opaque, to 5 feet within 10 feet of the street lot line or 6 feet farther back.
Zoning allows 8 feet in other locations on a residential lot. Anything over 6 feet, though, needs a building permit with plans certified by a New Mexico registered structural engineer or architect, a valuation-based fee, and foundation, reinforcement and final inspections. Above 8 feet you need a Variance.
The zoning Wall or Fence Approval is $35. For a wall over 6 feet the building permit uses Table 112-A on the valuation times 0.50 plus 65 percent plan review: 100 feet of 8 ft cedar fence valued at $3,100 comes to $48.63 plus $31.61, about $80, on top of the zoning fee.
The UAC exempts retaining walls whose finished grade difference does not exceed 36 inches unless they carry a surcharge, but the city's wall handout calls for engineer certification when the difference exceeds 24 inches and limits garden walls to retaining 24 inches. Confirm with the plan reviewer before building one.
The General Planning Fee Schedule charges $90 for walls or fences constructed without a permit instead of $35, and for work that needed a building permit the UAC adds an investigation fee equal to the permit fee. The FAQ says a stop work order is issued and the owner gets 30 to 45 days to comply.