Permit Required? Required (mechanical permit)
Typical Fee Range $63–$400 Online mechanical permit for houses; heat pumps also need an electrical permit
Fee Method $60.35 per furnace or heat pump + 5%; trades separate

What's Required in Seattle

  • A mechanical permit ($60.35 per unit plus 5 percent) is required to install, replace or substantially alter a furnace, heat pump, wall furnace, space heater or woodstove insert, including attached ducts and burners.
  • A new or altered circuit needs an SDCI electrical permit pulled by a licensed electrical contractor or the owner-occupant doing the work; reconnecting equipment to an unaltered lawful circuit is exempt.
  • New or altered gas piping needs a gas piping permit from Public Health Seattle and King County ($137 plus $27 per outlet in 2026).
  • Electric primary heat requires a Heat Equipment Sizing Form with the application.
  • Exterior units must show their distance to the property line and meet the noise code; units over 400 pounds need engineered structural and seismic anchorage.
  • Portable heating or cooling up to 3 kW or 10,000 Btu and 40 percent of the load, and like-in-kind thermostats, controls and motors of 10 HP or less, need no permit.
  • Mechanical permits are valid for 18 months; renewals and change fees are one-quarter of the $292 base fee.
  • Mechanical work reviewed with a building permit carries no additional mechanical fee.

Do You Need a Permit to Replace a Furnace or Install a Heat Pump in Seattle?

Yes, a mechanical permit from SDCI, and for a house or duplex it is one of the cheapest permits the city sells. The 2026 Fee Subtitle (Table D-8) charges $60.35 per unit for a forced-air furnace, heat pump, wall furnace, recessed wall heater, space heater or woodstove insert, including the ducts and burners attached to it, and the fee section says it applies to the installation, replacement or major alteration of heating equipment. With the 5 percent technology fee that is $63.37. Single-family and duplex furnace permits are online (OTC) permits under Tips 104 and 415, with no plan review. What adds cost is the other trades: a heat pump, mini-split or electric furnace needs an SDCI electrical permit for its new circuit, and any new or altered gas line needs a gas piping permit from Public Health Seattle & King County.

Seattle HVAC Permit Rules by Scenario

What you are doingCity filingRule
Replace a gas furnace with a gas furnace on the existing circuit and gas lineMechanical permit $60.35 + 5 percent = $63.37; no electrical permit if the circuit is unalteredTable D-8; Seattle Electrical Code 80.50(B)(4)
Install a heat pump or ductless mini-split with a new outdoor unit and circuitMechanical permit $63.37 plus an online electrical permit (circuit $43.80 at 30-50 A; $105.12 minimum plus $55.48 admin)Table D-8; Table D-15 items 7-8
Extend a gas line or add a gas appliance outletPublic Health gas piping permit: $137 plus $27 per outletPHSKC fee schedule (2026)
Add or rework ductwork as a separate jobMechanical permit priced on value (Table D-2) plus hourly review, 1 hour minimumFee Subtitle 22.900D.090.B; Table D-2 item 4b
Portable or window units up to 3 kW or 10,000 Btu and 40 percent of the loadNo permitSRC R105.2 item 16
Replace a thermostat, blower motor of 10 HP or less, control board or capacitorNo permitSeattle Electrical Code 80.50(B)(3) and (6); SRC R105.2 item 18
Outdoor unit near a property line, or any unit over 400 poundsShow the property-line distance and meet the noise code; over 400 lb needs engineered anchorageSDCI Mechanical Permit page

How Much Does an HVAC Permit Cost in Seattle?

Furnace swap: $60.35 + $3.02 technology fee = $63.37. Reconnecting the furnace to its existing, lawfully installed circuit without altering it is exempt from an electrical permit under Section 80.50(B)(4) of the Seattle Electrical Code, and if the gas line is untouched Public Health is not involved. Heat pump: $63.37 for the mechanical permit plus the electrical permit for the new 30 to 50 amp circuit ($43.80) and any electric back-up heat of 3 to 15 kW ($23.36); those line items fall below the $105.12 online minimum, so with the $55.48 administrative fee and technology fee the electrical permit is about $168.63, for a total near $232. Gas furnace with new gas piping: $63.37 plus a Public Health gas piping permit of $137 + $27 for one outlet = $164, about $227. A job that needs all three permits lands near $400. Ductwork permitted on its own is value-based: the Table D-1 index plus a one-hour ($292) review minimum. Renewing a lapsed furnace permit costs one-quarter of the base fee ($73).

Who Pulls the Permits?

SDCI's mechanical pages do not restrict who applies for the furnace permit; the application is filed in the Seattle Services Portal with contractor information on the record. The electrical permit must be bought by a contractor with a Washington electrical contractor license and a Seattle business license, or by the owner-occupant doing the wiring personally. Gas piping permits from Public Health go to a registered contractor or a homeowner doing the work personally. Electric primary heat requires a Heat Equipment Sizing Form with the application. Exterior units must show their distance to the property line and meet the noise code, and any unit over 400 pounds needs a structural engineer's calculations for support and seismic anchorage.

Timing and Inspections

Online mechanical and electrical permits for houses issue immediately or the same day in the portal. Plan-reviewed mechanical permits, typical for commercial and multifamily buildings, take about 9 weeks, or 24 hours for a simple mechanical STFI. Mechanical permits are valid for 18 months. Schedule the mechanical final and the electrical cover and final inspections through the portal; Public Health inspects gas piping and needs several business days to schedule. Mechanical plans reviewed with a building permit, as in a remodel or ADU, carry no additional mechanical fee.

How to Get a HVAC Permit in Seattle

1

List the trades the job touches

Equipment replacement alone needs the mechanical permit; a new circuit adds an SDCI electrical permit; new or altered gas piping adds a Public Health gas permit.

2

Confirm who applies for each permit

The HVAC contractor or owner files the mechanical permit; only a licensed electrical contractor or the owner-occupant may buy the electrical permit; a registered contractor or homeowner gets the gas permit from Public Health.

3

Apply online in the Seattle Services Portal

Create a Trade and Construction permit, select the mechanical permit for a single-family or duplex furnace or heat pump, add contractor information and any Heat Equipment Sizing Form, and pay $60.35 plus 5 percent per unit.

4

Buy the electrical and gas permits

Purchase the online SDCI electrical permit for the new circuit (printed immediately) and apply in Public Health's Permit Center for gas piping before the work starts.

5

Schedule the inspections

Request the mechanical final and the electrical cover and final through the portal, and the Public Health gas inspection through its Permit Center, allowing several business days for the county inspector.

Frequently Asked Questions

SDCI's mechanical permit for a furnace, heat pump, wall furnace or woodstove insert is $60.35 per unit plus the 5 percent technology fee, $63.37, issued online for houses and duplexes. A heat pump also needs an SDCI electrical permit for its circuit (about $169 with the administrative and technology fees), and new gas piping needs a Public Health gas permit at $137 plus $27 per outlet.
Yes, a mechanical permit; the Fee Subtitle applies the $60.35 furnace fee to the installation, replacement or major alteration of heating equipment. You do not need an electrical permit if the furnace is simply reconnected to its existing, lawfully installed circuit with no alteration, and no gas permit if the gas line is untouched.
Two permits: the SDCI mechanical permit, which lists heat pumps at $60.35 per unit, and an SDCI electrical permit for the new circuit, bought by a licensed electrical contractor or the owner-occupant doing the wiring. The outdoor unit must be shown with its distance to the property line and meet Seattle's noise code, and a unit over 400 pounds needs engineered anchorage.
SDCI's mechanical permit pages do not limit who applies for a single-family furnace permit. The electrical side is restricted: only a Washington-licensed electrical contractor or the owner-occupant doing the work personally may pull the electrical permit. Gas piping permits from Public Health go to a registered contractor or to a homeowner doing the work personally under RCW 18.106.150.
Ducts attached to a permitted furnace or heat pump are covered by the $60.35 unit fee. A separate duct job is a mechanical permit priced on the value of the work under Table D-2 plus an hourly review minimum of one hour at $292. Minor work or replacing a component of an existing mechanical system without altering its original approval is exempt from a building permit under SRC R105.2.
Online mechanical and electrical permits for houses issue immediately or the same day in the Seattle Services Portal. Plan-reviewed mechanical permits, typical for commercial and multifamily work, take about 9 weeks, with SDCI targeting 2 weeks for the initial review of simple projects and 4 weeks for complex ones; a simple mechanical STFI can issue within 24 hours.